- About Us
- Our Ministers
- Strategies and Priorities
- Grants and Funding
- Governance and Reporting
- Aboriginal Inclusion
- Reconciliation
- Diversity, Equity and Inclusion
- Suicide Prevention Action Plan
- Careers
- News
- Contact Us
Division R Roadworks
These parts specify requirements for roadworks and general construction, including drainage, earthworks, pavements, lighting, guardrail, Intelligent Transport Systems (ITS) and sundry works.
Document Name | Comments / Instruction |
Contract Specific Technical Requirements Division R Roadworks | Effective 1 July 2018 |
Part R03 Supply of Pipes Culverts and Drainage Structures | Effective 1 July 2018 |
Part R04 Installation of Stormwater Drainage | Effective 1 July 2018 |
Part R05 Kerbing | Effective 1 July 2018 |
Part R06 Boring | Effective 1 July 2018 |
Part R07 Trench Excavation and Backfill | Effective 1 July 2018 |
Part R08 Pavement Reinstatement | Effective 1 July 2018 |
Part R09 Controlled Low Strength Material | Effective 1 July 2018 |
Part R10 Earthworks | Effective 1 July 2018 |
Part R15 Pavement Materials | Effective 1 July 2018 |
Part R15A Pavement Material Specification | Effective 1 July 2018 |
Part R20 Pavements General | Effective 1 July 2018 |
Part R21 Construction of Unstabilised Pavements | Effective 1 July 2018 |
Part R22 Plant Mixed Stabilised Pavement | Effective 1 July 2018 |
Part R23 Insitu Stabilisation | Effective 1 July 2018 |
Part R24 Construction of Foamed Bitumen Stabilised Pavement | Effective 1 July 2018 |
Part R25 Supply of Bituminous Materials | Effective 1 July 2018 |
Part R26 Application of Sprayed Bituminous Surfacing | Effective 1 July 2018 |
Part R26DA Design and Application of Sprayed Bituminous Surfacing | Effective 1 July 2018 |
Part R27 Supply of Asphalt | Effective 1 July 2018 |
Part R28 Construction of Asphalt Pavements | Effective 1 July 2018 |
Part 29 Slurry Microsurfacing | Effective 1 July 2018 |
Part R30 Cold Planing | Effective 1 July 2018 |
Part R31 Cape Seals | Effective 1 July 2018 |
Part R32 Thin Asphalt Surfacing | Effective 1 July 2018 |
Part R33 Design Spray Seals | Effective 1 July 2018 |
Part R34 Surface Characteristics -Spray | Effective 1 July 2018 |
Part R35 Surface Characteristics Roughness | Effective 1 July 2018 |
Part R36 Shoulder Construction | Effective 1 July 2018 |
Part R37 Supply of Pavement Crack Sealant | Effective 1 July 2018 |
Part R38 Application of Pavement Crack Sealant | Effective 1 July 2018 |
Part R39 Texture Restoration of Sealed Roads | Effective 1 July 2018 |
Part R40 Supply of Cold Mix Asphalt | Effective 1 July 2018 |
Part R42 Supply and Installation of Steel Beam Safety Barrier | Effective 1 July 2018 |
Part R42A Safety Barrier Work Summary Template | Effective 1 July 2018 |
Part R43 Wire Rope Safety Barrier Systems | Effective 1 July 2018 |
Part R44 Construction of Concrete Safety Barrier Systems | Effective 1 July 2018 |
Part R45 Materials for Pavement Marking | Effective 1 July 2018 |
Part R46 Application of Pavement Marking | Effective 1 July 2018 |
Part R47 Supply and Application of Audio Tactile Line Marking | Effective 1 July 2018 |
Part R48 Supply of Signs | Effective 1 July 2018 |
Part R49 Sign installation | Effective 1 July 2018 |
Part R50 Supply of Lighting Components | Effective 1 July 2018 |
Part R50 Supply of Lighting Components | Effective 1 January 2019 |
Part R51 Supply of Luminaires | Effective 1 July 2018 |
Part R52 Installation of Lighting for Roads and Public Spaces | Effective 1 July 2018 |
Part R53 Supply and Installation of Conduits and Pits | Effective 1 July 2018 |
Part R54 Supply of LED Lanterns | Effective 1 July 2018 |
Part R58 Consumer Mains Electrical Power Distribution | Effective 1 July 2018 |
Part R61 Installation and Integration of ITS Equipment Effective July 2018 pdf | Effective 1 July 2018 |
Part R60 General Requirements for the Supply of ITS Equipment | Effective 1 July 2018 |
Part R62 Mains Power for Traffic Management Equipment | Effective 1 July 2018 |
Part R63 Telecommunications Network | Effective 1 July 2018 |
Part R64 Electrical Switchboards | Effective 1 July 2018 |
Part R65 ITS Enclosures | Effective 1 July 2018 |
Part R66 Supply of Variable and Changeable Message Signs | Effective 1 July 2018 |
Part R67 Imaging Equipment | Effective 1 July 2018 |
Part R68 Field Processors | Effective 1 July 2018 |
Part R69 Supply and Installation of Vehicle Detector Systems | Effective 1 July 2018 |
Part R70 Telecommunications Cabling | Effective 1 July 2018 |
Part R71 Help Phones | Effective 1 July 2018 |
Part R80 Supply of Guideposts and Delineators | Effective 1 July 2018 |
Part R81 Installation of Guideposts and Delineators | Effective 1 July 2018 |
Part R82 Gabions, Reno Mattresses and Mesh Panels | Effective 1 July 2018 |
Part R83 Construction of Shared Paths | Effective 1 July 2018 |
Part R84 Secondary Paving | Effective 1 July 2018 |
Part R85 Supply of Geotextiles | Effective 1 July 2018 |
Part R86 Supply and Installation of Fencing | Effective 1 July 2018 |