Skip to main content

Temporary full closure of the Belair rail line

Tuesday, 25 August 2020

The Department for Infrastructure and Transport advises that there will be a temporary full closure of the Belair rail line from first service Saturday, 29 August to last service Sunday, 30 August.

The closure is required for the Australian Rail Track Corporation (ARTC) to undertake a full track reconstruction of the Main Road, Blackwood level crossing located approximately 200 metres south-west of the Blackwood railway station. These works cannot be safely undertaken with trains operating and have been scheduled to minimise the impact for customers.

To facilitate these works, all services will be cancelled and replaced with substitute buses from first service Saturday, 29 August to last service Sunday, 30 August.

During the closure, substitute buses will operate between Adelaide to Belair as closely as possible to the existing train timetable.

For the AFL match on Saturday, 29 August between Port Adelaide and Sydney, additional substitute buses will operate before and after the match to increase capacity for AFL patrons.

Regular full line services will resume from first service Monday, 31 August.

The following level crossings will be closed to motorists at these times:

  • Main Road, Blackwood from 9am, Saturday, 29 August to 5am, Sunday, 30 August
  • Grange Road, Lower Mitcham from 12am to 5pm, Sunday, 30 August
  • Main Road, Glenalta from 10:30am to 11pm, Sunday, 30 August.

Motorists are advised to please plan ahead, allow extra travel time and observe signage.

For full public transport information, please visit Adelaide Metro.

The department thanks commuters for their patience while these works are undertaken.